Datum survey
Perimeter anchoring
Stud and grid erection
Tolerance audit
Setting out floor tracks and ceiling perimeters against architectural coordinates using multi-plane rotary laser units.
Fixing heavy-gauge base channels and slotted deflection heads with engineered acoustic isolation strips.
Placing vertical C-studs and suspended T-bar frameworks to precise centres for downstream board installation.
Verifying millimetre plumb lines, diagonal squareness, and load transfers prior to trade handover.


Engineering and acoustic discipline
Every framing assembly adheres strictly to manufacturer load tables and British standard deflection tolerances. We install slotted deflection heads to absorb slab movement without transferring loads to partition walls.
Acoustic perimeters receive continuous isolation gaskets and mechanical perimeter seals. Main contractors receive plumb drylining substructures ready for immediate boarding without corrective shimming.
True vertical lines, secure deflection joints, and level acoustic grids ensure subsequent trades work without corrective delays.
Installation standard, Apex Grid & Stud
Send architectural partition schedules and ceiling specifications for commercial tender pricing.


